Difference between revisions of "Furunål"
(→Time schedule) (Tag: Visual edit) |
(→Project description - Android coordinate picker) (Tag: Visual edit) |
||
Line 1: | Line 1: | ||
== Project description - Android coordinate picker == | == Project description - Android coordinate picker == | ||
− | The task description can be found [http://www.uio.no/studier/emner/matnat/ifi/INF5750/h15/group-projects/coordinate-picker/index.html here]. They way we understand the project description, the problem we are going to solve is that currently the DHIS2 is only able to capture the coordinates of the current user. However, sometimes there is a need to capture coordinates of locations the user is not currently at, and this is what we are going to do. | + | The task description can be found [http://www.uio.no/studier/emner/matnat/ifi/INF5750/h15/group-projects/coordinate-picker/index.html here]. They way we understand the project description, the problem we are going to solve is that currently the Tracker module of DHIS2 is only able to capture the coordinates of the current user. However, sometimes there is a need to capture coordinates of locations the user is not currently at, and this is what we are going to do. This is to be done by using a map and clicking on the position with the coordinates the user wishes to capture. |
+ | |||
+ | In other words, we are implementing new functionality in the Tracker module. | ||
== List of group members == | == List of group members == | ||
Line 16: | Line 18: | ||
Features: | Features: | ||
− | Register location from a point-and-click on a map | + | Register location from a point-and-click on a map ind the Tracker module |
Architecture: | Architecture: | ||
Line 26: | Line 28: | ||
== Time schedule == | == Time schedule == | ||
− | Week 45: Start project, write Wiki pages and familiarize with project. | + | Wiki pages will be updated continuously and is not mentioned in the week schedule below. Milestones as described on the wiki front page can be found in the section below this. |
+ | |||
+ | Week 45: Start project, write Wiki pages and familiarize with project (milestone 1). | ||
+ | |||
+ | Week 46: Familiarize with the DHIS2 system, testing and practicing with the system. Share experiences with each other, and start on the first bare-bone version (milestone two). | ||
+ | |||
+ | Week 47: Continue work with and finish the bare-bone version by November 22th. (This is a minimum, as we hope to have had more progression than this on the 22th.) | ||
+ | |||
+ | Week 48: Starting the work with "translating" our work from static HTML to a proper DHIS2 webapp (milestone three. We intend to fill the requirements by the end of this week, as we do not yet really know how demanding this will be. | ||
+ | |||
+ | Week 49: Continue the work from last week. If we are finished with milestone two by this time, we start finishing the app. If not, we continue with finishing milestone three by the deadline on December 4th. | ||
− | Week | + | Week 50: Finishing project and wrapping things up. Final delivery December 11th. Create and practice on presentation. |
== Milestones == | == Milestones == | ||
Each group should follow these milestones: | Each group should follow these milestones: |
Revision as of 17:03, 7 November 2015
Contents
Project description - Android coordinate picker
The task description can be found here. They way we understand the project description, the problem we are going to solve is that currently the Tracker module of DHIS2 is only able to capture the coordinates of the current user. However, sometimes there is a need to capture coordinates of locations the user is not currently at, and this is what we are going to do. This is to be done by using a map and clicking on the position with the coordinates the user wishes to capture.
In other words, we are implementing new functionality in the Tracker module.
List of group members
Martin Kolbeinsvik - martikol@ifi.uio.no
Jon-Robert Skårberg - jonrobes@ifi.uio.no
Sebastian Søberg - sebass@ifi.uio.no
Daniel Bugajski - prezemyb@student.matnat.uio.no
Summary of requirements
Features:
Register location from a point-and-click on a map ind the Tracker module
Architecture:
Google maps API
Android SDK
Time schedule
Wiki pages will be updated continuously and is not mentioned in the week schedule below. Milestones as described on the wiki front page can be found in the section below this.
Week 45: Start project, write Wiki pages and familiarize with project (milestone 1).
Week 46: Familiarize with the DHIS2 system, testing and practicing with the system. Share experiences with each other, and start on the first bare-bone version (milestone two).
Week 47: Continue work with and finish the bare-bone version by November 22th. (This is a minimum, as we hope to have had more progression than this on the 22th.)
Week 48: Starting the work with "translating" our work from static HTML to a proper DHIS2 webapp (milestone three. We intend to fill the requirements by the end of this week, as we do not yet really know how demanding this will be.
Week 49: Continue the work from last week. If we are finished with milestone two by this time, we start finishing the app. If not, we continue with finishing milestone three by the deadline on December 4th.
Week 50: Finishing project and wrapping things up. Final delivery December 11th. Create and practice on presentation.
Milestones
Each group should follow these milestones:
- Milestone 1: 8th November
Document features and architecture on Wiki
Show understanding of DHIS2 web apps
- Milestone 2: 22th November
First bare-bone version - static HTML
Uploadable as DHIS2 web app
- Milestone 3: 4th December
- Finished, if applicable also with mobile app.
- Final delivery: 11th December
- Presentation: mid December