Difference between revisions of "Geo-3"
From mn/ifi/inf5750
Line 21: | Line 21: | ||
= Time schedule = | = Time schedule = | ||
− | *Milestone 1: November 1st | + | *Milestone 1: November 1st |
**Document features and architecture | **Document features and architecture | ||
**Setup launchpad project | **Setup launchpad project | ||
**First prototype | **First prototype | ||
− | *Milestone 2: November 15th | + | *Milestone 2: November 15th |
− | + | **First bearbone version | |
− | + | **Uploadable App | |
− | |||
*Milestone 3: November 30th | *Milestone 3: November 30th | ||
− | + | **Complete App | |
− | |||
*Final: December 8th | *Final: December 8th |
Revision as of 19:40, 30 October 2013
Repository: launchpad.net/geo-3
Team: (link)
- Aleksander Rem
- Franck Roucou
- Therese-Mari P. Thomassen
Contents
Requirements
- Single event without registration dataentry
- Show current location
- Data stored with location
- Save dataentry with current location or selected location
- Possiblitiy of storing images in entry form
- Show data entered on map
- Responsive design deployed as web and Android app
- Login/Logout option
- Search/filter existing events (on map or in a list)
Time schedule
- Milestone 1: November 1st
- Document features and architecture
- Setup launchpad project
- First prototype
- Milestone 2: November 15th
- First bearbone version
- Uploadable App
- Milestone 3: November 30th
- Complete App
- Final: December 8th
- Presentation: December 9th
Prototype
Tasks
To be announced...
Screenshots and screen flows
To be announced...
Documented learning
- Creating a launchpad project
- ...
Suggested improvments to APIs
To be announced...
Downloads
To be announced...
Todo
- Get familiar to DHIS2 API
- Define who is using the application (front desk?, medical staff?, administration?)
- Define a more concrete workflow
- Define the overall achitecture
- Split the tasks
- How to make an android app downloadable from DHIS2
....
- define more tasks