Difference between revisions of "Geo-3"
From mn/ifi/inf5750
Line 18: | Line 18: | ||
*Login/Logout option | *Login/Logout option | ||
*Search/filter existing events (on map or in a list) | *Search/filter existing events (on map or in a list) | ||
+ | |||
= Time schedule = | = Time schedule = | ||
Line 35: | Line 36: | ||
*Final: December 8th | *Final: December 8th | ||
*Presentation: December 9th | *Presentation: December 9th | ||
+ | |||
= Prototype = | = Prototype = | ||
+ | |||
= Tasks = | = Tasks = | ||
To be announced... | To be announced... | ||
+ | |||
= Screenshots and screen flows = | = Screenshots and screen flows = | ||
To be announced... | To be announced... | ||
+ | |||
= Documented learning = | = Documented learning = | ||
Line 50: | Line 55: | ||
*Creating a launchpad project | *Creating a launchpad project | ||
*... | *... | ||
+ | |||
= Suggested improvments to APIs = | = Suggested improvments to APIs = | ||
To be announced... | To be announced... | ||
+ | |||
= Downloads = | = Downloads = | ||
To be announced...<br> | To be announced...<br> | ||
+ | |||
= Todo<br> = | = Todo<br> = | ||
− | + | *Get familiar to DHIS2 API<br> | |
− | + | *Define who is using the application (front desk?, medical staff?, administration?)<br> | |
− | + | *Define a more concrete workflow<br> | |
− | + | *Define the overall achitecture<br> | |
− | + | *Split the tasks <br> | |
− | + | *How to make an android app downloadable from DHIS2 <br> | |
− | + | *....<br> | |
− | + | *define more tasks<br> | |
− | |||
− | |||
− | |||
− | |||
− | ....<br> | ||
− | |||
− |
Revision as of 19:42, 30 October 2013
Repository: launchpad.net/geo-3
Team: (link)
- Aleksander Rem
- Franck Roucou
- Therese-Mari P. Thomassen
Contents
Requirements
- Single event without registration dataentry
- Show current location
- Data stored with location
- Save dataentry with current location or selected location
- Possiblitiy of storing images in entry form
- Show data entered on map
- Responsive design deployed as web and Android app
- Login/Logout option
- Search/filter existing events (on map or in a list)
Time schedule
- Milestone 1: November 1st
- Document features and architecture
- Setup launchpad project
- First prototype
- Milestone 2: November 15th
- First bearbone version
- Uploadable App
- Milestone 3: November 30th
- Complete App
- Final: December 8th
- Presentation: December 9th
Prototype
Tasks
To be announced...
Screenshots and screen flows
To be announced...
Documented learning
- Creating a launchpad project
- ...
Suggested improvments to APIs
To be announced...
Downloads
To be announced...
Todo
- Get familiar to DHIS2 API
- Define who is using the application (front desk?, medical staff?, administration?)
- Define a more concrete workflow
- Define the overall achitecture
- Split the tasks
- How to make an android app downloadable from DHIS2
- ....
- define more tasks