Difference between revisions of "Pied Piper"

From mn/ifi/inf5750
Jump to: navigation, search
(Timeline)
Line 36: Line 36:
 
Temporary timeline due to indefinite deadline.
 
Temporary timeline due to indefinite deadline.
 
[[File:Timeline Pied piper.png|left|thumb|893x893px]]
 
[[File:Timeline Pied piper.png|left|thumb|893x893px]]
 +
 +
 +
 +
 +
 +
 +
 +
 +
  
 
== Licensing ==
 
== Licensing ==

Revision as of 15:42, 26 October 2017

Group members

  • Dawood Ahmad (dawoodah@ifi.uio.no)
  • Larry Parker (larryp@ifi.uio.no)
  • Thomas Kristiansen (tomkri@ifi.uio.no)
  • Ullvar Brekke (ullvarb@ifi.uio.no)

Product descriptions requirements

Assignment :

Assignment description

Create an app that provides a visualisation of a clinical cascade, with the HIV 90-90-90 cascade as the primary example

Features

Present the cascade as a bar/column chart, where (from the left to right) the value of each bar represents the subset of the previous, and where there is generally a target (in percent) associated with it. The app needs to be able to present this information in (at least) three ways:

  • As percentages, where the first bar in the cascade is 100%, and the subsequent bars as expressed as percentages of the previous. See example 1 below.
  • As raw numbers, but showing both the actual number and the gap (i.e. difference between target and actual).
  • As raw data and percentages (on different axis), i.e. bars with the raw data and a line with the percentage.

Because this app should be usable in different settings/ countries and thus different DHIS2 databases, there must be an interface for configuring the cascade and a possibility of saving these configurations for reuse later. That gives us these required feutures:

  • What data elements/indicators to include in the cascade, as this might differ from country to country or even at different levels within a country.
  • The target for each data element/indicator. While the global target for HIV is 90-90-90, it should be possible to set the target in the app.
  • Save different configurations. Cascades are often done for different population groups (by sex, age etc). Therefore, it should be possible to save different configurations.
  • Switch between the different configurations.
  • Select the time period and organisation unit to display data for. Either as part of the configuration or when generating the visualisation.
  • There must be support for downloading the visualisations.

Assumptions

...

Architecture

We will develop the product with React framework due to personal interest, experience and well documented framework.

Higcharts (depends on license)/react chartjs will be used to plot the data on to the application.

Timeline

Temporary timeline due to indefinite deadline.

Timeline Pied piper.png






Licensing

Open licsens for student (non-profit) )developers for React and Highcharts

Division of labour

Everyone works on everything.

We will use Trello to create a backlog of assignments, and everyone pulls an assignment from that backlog when they are going to work on the project.

We will meet at least once a week to discuss and possibly merge our work together.

Github project repository

https://github.uio.no/PiedPiper/inf5750-dhis2-app

References