Difference between revisions of "Super ultra team maximum Survey"

From mn/ifi/inf5750
Jump to: navigation, search
(Time schedule)
(Time schedule)
Line 28: Line 28:
 
'''Milestones'''<br/>
 
'''Milestones'''<br/>
 
Milestone 1: Draft of project requirement in wiki <br/>
 
Milestone 1: Draft of project requirement in wiki <br/>
Milestone 2: Single event data entry form / User Interface design <br/>
+
Milestone 2: Single event data entry form / User Interface design/DHIS2 app installable <br/>
 
Milestone 3: Skip logic /  DHIS2 Implementation <br/>
 
Milestone 3: Skip logic /  DHIS2 Implementation <br/>
  

Revision as of 12:25, 31 October 2013

Group Members


Sanjeev Khatiwada (sanjeevk)
Dag Roger Stokland Rui (drrui)
Jon Ulstrup Pettersen (jonup)


Summary Of Requirements


  1. Single event data entry form
  2. Skip logic
  3. Make interace for easily defining form and skip logic
  4. Available as DHIS2 web app and android app
  5. Touch friendly UI

Time schedule


Meeting Time
Tuesday 10:00 to 12:00
Thrusday 12:00 to 16:00
Friday 11:00 to 15:00

Milestones
Milestone 1: Draft of project requirement in wiki
Milestone 2: Single event data entry form / User Interface design/DHIS2 app installable
Milestone 3: Skip logic / DHIS2 Implementation

How you are dividing tasks within the group


Screenshots and screen flows


Documented learning during project


Suggested improvements to APIs etc


Link to repository


Download link to sample web app or Android app