Difference between revisions of "20210503 photolitho"

From mn.fysikk.laglivlab
Jump to: navigation, search
(Created page with "* cleaned wafers with plasma only * 1st wafer ** 3100 RPM ~ 25 um ** prebake on programmable hot plate ** Masking with UV-Kub 2. UV at 11% intensity for 30 sec. ** Hot plate...")
 
Line 7: Line 7:
 
** The hot plate seems to take longer than the timer on my telephone. This needs to be checked!
 
** The hot plate seems to take longer than the timer on my telephone. This needs to be checked!
 
** development with PGMEA for 2:45 was too long time! Misjudged the residue and continued another 30s, then it was completely destroyed.
 
** development with PGMEA for 2:45 was too long time! Misjudged the residue and continued another 30s, then it was completely destroyed.
* 2nd wafer 3100 RPM ~ 25 um
+
* 2nd wafer Dag's pattern
 +
** 3100 RPM ~ 25 um
 
** prebake on VWR hot plate, no nice control of ramp in temp
 
** prebake on VWR hot plate, no nice control of ramp in temp
 
**  Masking with UV-Kub 2. UV at 11% intensity for 30 sec.
 
**  Masking with UV-Kub 2. UV at 11% intensity for 30 sec.
 
** Postbake on VWR hotplate
 
** Postbake on VWR hotplate
 
** Developed 3min in PGMEA gave perfect sylinders and gaps between them. quick dip to remove a little residue and done.
 
** Developed 3min in PGMEA gave perfect sylinders and gaps between them. quick dip to remove a little residue and done.

Revision as of 13:21, 3 May 2021

  • cleaned wafers with plasma only
  • 1st wafer
    • 3100 RPM ~ 25 um
    • prebake on programmable hot plate
    • Masking with UV-Kub 2. UV at 11% intensity for 30 sec.
    • Hot plate too hot, 65C postbake happened at 72-66C
    • The hot plate seems to take longer than the timer on my telephone. This needs to be checked!
    • development with PGMEA for 2:45 was too long time! Misjudged the residue and continued another 30s, then it was completely destroyed.
  • 2nd wafer Dag's pattern
    • 3100 RPM ~ 25 um
    • prebake on VWR hot plate, no nice control of ramp in temp
    • Masking with UV-Kub 2. UV at 11% intensity for 30 sec.
    • Postbake on VWR hotplate
    • Developed 3min in PGMEA gave perfect sylinders and gaps between them. quick dip to remove a little residue and done.