20210310

From mn.fysikk.laglivlab
Revision as of 19:38, 11 March 2021 by Dagkd@uio.no (talk | contribs) (continued)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Started with new SU8
  • Took it out from the fridge at 09:00
  • Transferred to a new syringe
  • Let out inside alu foil to thermalize
  • new wafer cleaned for dust with IP, plasma treated and then 160 C for 7-8 min
  • changed spin program to 970 rpm to achieve 890 rpm on the readout -> 100 um thick layer.
  • transferred su8 from syringe
  • forgot to leave it some minutes on the wafer to thermalize before spinning
  • spun for 60s at 890 rpm (readout)
  • leave for 10 minutes on spin coater
  • to keep the hot plate at 95C beyonf 99.9 min I programmed a third period: 40 + 80 min
  • back 4 hours later due to a belated meeting
  • turned the mask the other way because I checked once more which was up and it was confirmed by what I saw in the microscope
  • transferred wafer to UV-KUB, had the light on for some seconds (big mistake)
  • chose 600 um thickness to press mask onto wafer (see later: maybe not enough?)
  • used 44s at 50% to have 1000 mJ/cm^2
  • post baked
  • developing delayed 2-3 hours due to meeting (is this bad?)
  • Same problem as before:
    • small structures are not removed by developer
    • differences on the wafer in how well small structures are developed
    • developed 5 min according to table, but no small structures developed
    • continued several rounds up to 11 min, from 8-9 min nothing seemed to change