13. Future major changes (2013)!

From mn/geo/geoit
Revision as of 12:31, 12 March 2013 by Nik (talk | contribs) (Created page with "'''- Increased vertical resolution (Q2 2013).''' High resolution forecast and analysis: increase form 91 to 137 levels. Technical test data is available in MARS. '''- New ter...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

- Increased vertical resolution (Q2 2013).

High resolution forecast and analysis: increase form 91 to 137 levels.
Technical test data is available in MARS.

- New terminology

Deterministic forecast --> High-resolution forecast - "HRES"
EPS --> Ensemble forecast - "ENS"

- Batch system on ECgate will change from LoadLeveler to SLURM.

Retrieval scripts must be changed accordingly.
Does note apply to the HPCF (c2a) so that retrieval scripts on the two systems will be different and need to be kept separate.