Difference between revisions of "Photolithography"

From mn.fysikk.laglivlab
Jump to: navigation, search
(Preparations the day before photolithography)
Line 15: Line 15:
 
** GM1060 for layers between 5-25µm. [https://wiki.uio.no/mn/fysikk/laglivlab/images/7/72/SU8_GM1060.pdf Full datasheet]
 
** GM1060 for layers between 5-25µm. [https://wiki.uio.no/mn/fysikk/laglivlab/images/7/72/SU8_GM1060.pdf Full datasheet]
 
** GM1070 for layers between 25-200µm.  [https://wiki.uio.no/mn/fysikk/laglivlab/images/5/54/SU8_GM1070.pdf Full datasheet]
 
** GM1070 for layers between 25-200µm.  [https://wiki.uio.no/mn/fysikk/laglivlab/images/5/54/SU8_GM1070.pdf Full datasheet]
* Find and note the following parameters:
+
* Find and note the following parameters ([[SU8 parameters|See page with tables and notes on parameters]]):
 
** Speed of spin-coater in rpm
 
** Speed of spin-coater in rpm
 
** Pre- and post-bake times at 65 and 95 C, t_{65}, t_{95}
 
** Pre- and post-bake times at 65 and 95 C, t_{65}, t_{95}

Revision as of 16:05, 10 November 2023

Photolithography explained

Photolithography

SU8 process (square features)

Procedure updated Nov 2023

Handling of chemicals

Preparations the day before photolithography

  • Open a new lab note here
    • Note down your desired process
    • As you go on the day, note all observations and final result
  • Decide how thick layer of SU8 you need
  • Choose right SU8 and protocol
  • Find and note the following parameters (See page with tables and notes on parameters):
    • Speed of spin-coater in rpm
    • Pre- and post-bake times at 65 and 95 C, t_{65}, t_{95}
    • Exposure dose
    • PGMEA development time
  • Take SU8 out of fridge and place in cupboard in 129
  • Program
    • Spin coater
    • Hotplate

Materials and tools

  • SU8
  • Wafer (3" or 4")
  • Isopropanol
  • Wafer tweezers (in LAF bench and fume hood)
  • Fine tipped tweezer
  • Clean glass plate for placing wafers on
  • N2 guns in 128 and 129
  • Beaker and wafer holder for development
  • Lint free paper

Procedure

  • Turn on N2
  • Turn on and open LAF bench


  • Turn off N2
  • Turn off and close LAF bench

Procedure notes before Nov 2023

Programming various equipment

UV KUB programming

Spin coater programming

Hot plate programming

Important notes 05.03.2021

  • UV doses in the tables are too large. Look at comments in Matias Busek's protocol
  • The programmable hotplate is not reliable
    • Two times in a row the same procedure for 25 um thick substrate with VWR and programmable hot plates gave good results for VWR hotplate but overdevelopment for programmable hotplate.
    • I have observed that the programmable hotplate seems to spend too long time at each step.

XT process (rounded channels)